Softener carbon filter combo.
Sterling water treatment plant highland.
The wells are controlled by a scada system that will control each well such that the 4 storage tanks located in various locations of the city are maintained at a full level regardless of water demand.
C apable of treating up to 10 million gallons a day the snrc recharges the local bunker hill groundwater basin and creates new opportunities for the surrounding community in the form of education and training community space neighborhood improvements and new habitat for the santa ana sucker fish.
The city of sterling has had no violations in 2016 and remains in compliance with colorado department on health and environment regulations.
To combat the problem east valley water district proposed development of a state of the art water reclamation facility to capture and treat wastewater and recharge the basin with the recycled water.
After three years of planning east valley water district broke ground on its sterling natural resource center and is ready to begin construction on the 150 million waste water recycling plant at.
The 14 acre sterling natural resource center snrc advanced wastewater treatment plant in the city of highland california that will produce up to 10 million gallons of disinfected recycled water per day.
Skip to main content.
It is expected to be completed late 2021 to.
The 126 million recycling plant in highland is expected to recharge the area s groundwater basinwith up to 10 million gallons of water daily and boost the region s water independence in the event.
The treatment plant is being built on the east lot and a public resource center emergency operations center will be built on the west side of del rosa.
A bout the water treatment plant the city of sterling has five 5 full time employees operating the water treatment facility and completed the third full year of the being online.
The sterling drinking water is taken from a system of 12 wells and distributed by approximately 86 miles of water mains.