The vertical deflection criterion.
Stick system curtain wall details pdf.
Drainage and ventilation is achieved via the mullion on mullion drained or.
The unique flexibility is demonstrated by the various system variants and enhancement options all of which are feasible with minor additions.
A stick curtainwall is a system in which the mullions are installed first and then the glass panels are inserted into the mullion framing in the field.
The article illustrates curtain wall to structure alignment conditions and details incorporation of end wall dams where unitized curtain wall terminates against other wall systems and thermal bridging.
Unit a red is inserted.
Building envelope design guide.
Curtain walls and their limitations by michael j.
Unit tape structural part epdm setting break horizontal wjllion wjllion nsclatec class.
West stick curtain wall stick curtain wall plan details second floor is 0 second floor stick curtain wall system 1 second fl 12 0 roof 0 angle bolt glass insulation mullion water proofing flashing rigid slab insulation deck metal beam glazing gask lg.